Crane EE-7272 User Manual Page 44

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 43
40
max. 1,20 m
2,70 m
85
86
85.1
85.2
SW 14
80
81
85
86
B8 Foundation
formwork
Foundation strap
Foundation strap 80 is provided for
shuttering of single foundations
according to the so-called “arming
vane” principle. Attach fixing board 81
with nails. Fig. 65.
Foundation tie clamp
In the absence of lower tie positions
in strip and single foundations, the
foundation tie clamp is used with
perforated foundation ties.
Required perforated foundation tie
length:
foundation width + 50 cm
Assembly
1. Place elements onto the perforated
tie 86.
2. Attach the foundation tie clamp 85 in
the lowest connection hole with pin
85.1.
3. Attach perforated tie to the tensioning
lever 85.2.
4. Tension with ratchet spanner.
Permissible tensile force: 16 kN.
Fig. 66.
Fig. 66
85
86
85.1
85.2
SW 14
85
86
ca. 25
Fig. 65
80
max 1,0 m
max 2,40 m
81
12
Page view 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 79 80

Comments to this Manuals

No comments